Skip to main content

Power Platform Development Services.Governed by Design.

300 canvas apps with no inventory, flows failing without anyone noticing, and citizen developers building solutions IT can't trace. Our Power Platform consulting services exist to prevent exactly that — Power Apps with real architecture, Power Automate with real error handling, Dataverse modelled as an actual database, and a Center of Excellence deployed before the sprawl starts.

  • Power Apps
  • Power Automate
  • Dataverse
  • CoE governed

Why Entalogics for Power Platform

What every Power Platform
consulting company
should govern first.

Low-code doesn't mean low-risk. The Power Platform estates we take over always have the same four problems — and fixing governance before building features is the difference between a productive platform and an ungoverned mess.

Governance01

Nobody deployed a Center of Excellence, so nobody knows what exists.

300 apps across the tenant. No inventory. No ownership. No usage data. We deploy the CoE Starter Kit first — app and flow inventory, maker analytics, DLP enforcement, and environment monitoring. Governance before the first new app gets built.

Architecture02

Dataverse got treated like a spreadsheet import, not a relational database.

Flat tables with 80 columns, no relationships, no option sets, no business rules. We model Dataverse properly — entity relationships, lookup fields, security roles, calculated columns. The data layer that Power Apps, Power BI, and Power Automate all depend on has to be right, or everything built on top of it inherits the mess.

Automation03

Power Automate flows had no error handling, so failures were invisible.

A flow that fails without notification is worse than no automation — the team assumes the process is running while data silently stops syncing. We wire try-catch scopes, failure branches, timeout handling, and ops channel notifications on every flow.

Type safety04

Everything was edited directly in production because nobody set up ALM.

Managed solutions, environment pipelines, dev-test-prod promotion. No editing in production. No unmanaged customizations blocking future deployments. Solution-aware development from the first component.

When Power Platform, when not

Power Platform is a tool.
Not a replacement for engineering.

Power Platform handles 80% of internal business automation faster than custom code. The other 20% needs pro-dev — and knowing exactly where that boundary sits is what keeps a low-code investment from becoming the next legacy problem.

BUILD ON POWER PLATFORM WHEN

  • Internal business apps — approvals, request forms, dashboards — need to ship in days, not months
  • Microsoft 365 is already the workplace and Dataverse, Teams, and SharePoint are in play
  • Citizen developers need a governed path to build safely instead of Excel workarounds
  • Process automation connects Dynamics 365, SharePoint, Outlook, and Teams natively

BUILD CUSTOM WHEN

  • The app is customer-facing with brand-specific UI that canvas app controls can't deliver
  • Business logic exceeds what Power Fx can express without becoming unreadable
  • Data volumes or request rates push past Dataverse's built-in throttling limits
  • The team is engineering-first and the use case justifies full-stack architecture

WE SAY NO WHEN

  • "Power Apps for our consumer-facing product" — the platform isn't designed for external audiences at that level
  • "Let everyone build whatever they want" — that's 300 ungoverned apps in six months
  • "Replace our entire custom platform with Power Platform" — some problems need real code

What we build on Power Platform

Power Platform development
services and consulting we deliver.

Nine ways this work shows up for real clients. Each one governed, solution-aware, and built for enterprise production — not a demo environment somebody forgot to clean up.

  • S01

    Power Apps development services

    Model-driven apps for data-heavy business workflows. Canvas apps for mobile-first field tools. Both backed by Dataverse with role-based security, offline sync, and proper entity modelling.

    POWER APPSDATAVERSEMODEL-DRIVENCANVAS
  • S02

    Power Automate workflow automation

    Approval chains, document routing, cross-system orchestration, scheduled data syncs. Every flow with try-catch, failure notifications, timeout handling, and run-history monitoring. No silent failures.

    POWER AUTOMATEDATAVERSEAPPROVALSTEAMS
  • S03

    Power BI consulting and embedded analytics

    Dashboards embedded in Power Apps, SharePoint, and Teams. Dataverse as the source. DAX measures, row-level security, and reports that decision-makers open daily — not once a quarter.

    POWER BIDAXDATAVERSEEMBEDDED
  • S04

    Copilot Studio chatbot development

    AI-powered chatbots for internal support, HR inquiries, IT helpdesk, and customer-facing FAQ. Connected to Dataverse for real data, deployed in Teams and Power Pages.

    COPILOT STUDIODATAVERSETEAMSPOWER PAGES
  • S05

    Power Pages website development

    External-facing portals, customer self-service, vendor onboarding, and partner dashboards. Dataverse-backed with authentication, role-based access, and forms that don't require a full-stack web build.

    POWER PAGESDATAVERSEAUTHENTICATIONLIQUID
  • S06

    RPA with Power Automate Desktop

    Legacy systems without APIs — desktop automation handles the screen clicks, data entry, and file operations that can't be reached through cloud connectors. Attended or unattended, monitored in production.

    DESKTOP FLOWSRPAPOWER AUTOMATEATTENDED/UNATTENDED
  • S07

    CoE governance and DLP setup

    Center of Excellence Starter Kit deployed, DLP policies configured per environment, managed environments enabled, app and flow inventory automated. Governance that scales without manual oversight.

    COE KITDLPMANAGED ENVIRONMENTSADMIN CENTER
  • S08

    Power Platform migration services

    InfoPath forms to Power Apps. Access databases to Dataverse. Classic SharePoint workflows to Power Automate. Legacy tools retired cleanly with the replacement tested and live before anything gets switched off.

    POWER APPSPOWER AUTOMATEDATAVERSESHAREGATE
  • S09

    Power Platform managed services

    Ongoing monitoring, flow health checks, CoE dashboard reviews, Dataverse maintenance, and platform updates — so the governed estate we handed over doesn't quietly drift back toward sprawl.

    COEPOWER AUTOMATEDATAVERSEADMIN CENTER

The playbook

Power Platform development
patterns we ship on repeat.

Patterns from real enterprise Power Platform deployments — not demo tenant screenshots.

  • P01

    CoE Starter Kit from day one

    App inventory, flow inventory, maker analytics, DLP enforcement. Deployed before the first citizen developer builds anything.

  • P02

    Solution-aware everything

    Every app, flow, table, and component in a managed solution. Promoted through pipelines. Nothing unmanaged in production.

  • P03

    Error handling on every flow

    Try-catch scopes, configure-run-after for failure branches, timeout actions, notification to ops channel. No silent failures surviving past the first build.

  • P04

    Dataverse with proper relational modelling

    Entity relationships, lookup fields, option sets, business rules, calculated columns. No flat tables imported from Excel pretending to be a data model.

  • P05

    DLP policies per environment

    Business connectors separated from non-business. HTTP blocked in citizen environments. Premium connectors restricted to governed environments only.

  • P06

    Power BI with row-level security

    Embedded dashboards with RLS matching Dataverse security roles. Users see only their data. No separate permission model to maintain alongside Dataverse.

Signature case

A logistics company,
from 300 ungoverned apps to a governed Power Platform estate.

A logistics company with 300 canvas apps, 180 Power Automate flows, no DLP policies, no environment strategy, and 12 flows that had been silently failing for over a month — syncing nothing while operations assumed the data was current. Deployed CoE Starter Kit, configured DLP, consolidated into 3 governed environments, fixed failing flows, and established ALM pipelines in 8 weeks.

Before

300 apps, no inventory · 180 flows, 12 silently broken · 0 DLP policies · 1 default environment

After

186 governed apps · 94 monitored flows · DLP enforced · 3 environments with ALM pipelines

  • Ungoverned apps300 → 0
  • Silent flow failures12 → 0
  • To fully governed8wk
  • Business disruption0

Industries we serve

Power Platform development
across industries.

We've delivered Power Platform consulting services for logistics, healthcare, finance, manufacturing, and enterprise operations — anywhere internal business automation needs to ship fast without creating an ungoverned mess.

  • Logistics & Supply Chain
  • Healthcare
  • Finance & Financial Services
  • Manufacturing
  • Enterprise Operations
  • Government & Public Sector

Engagement shape

Eight to ten weeks
on a Power Platform engagement.

Solution by solution. The current environment stays live the entire time we work.

  • W01

    Audit + RFC

    Two senior Power Platform architects. App/flow inventory, DLP gap analysis, Dataverse model review, ALM maturity check. A ranked, dollarized plan.

  • W02–03

    Foundation + governance

    CoE Starter Kit deployed, DLP policies enforced, environment strategy implemented, first solution built with ALM pipelines. Governed from day one.

  • W04–08

    Solution by solution

    Apps built, flows automated, Dataverse modelled, Power BI dashboards embedded. Each component promoted through pipelines to production.

  • W09+

    Handoff

    CoE dashboard live, ALM pipelines operational. Governance runbook handed to your team — or we stay on for Power Platform managed services.

Stack

Tools we
Tools we reach
reach for for first.

Our default Power Platform development stack — picked for enterprise governance.

Apps
Power Apps (Model-driven + Canvas) · Power Pages · Dataverse
Automation
Power Automate · Desktop Flows · Copilot Studio
Analytics
Power BI · DAX · Dataflows · Embedded dashboards
Governance
CoE Starter Kit · DLP · Managed Environments · Pipelines
ALM
Solutions · Pipelines · GitHub · Azure DevOps
Integration
Dataverse connectors · Custom connectors · HTTP · MuleSoft

Engagement

Three ways to hire
Power Platform developers
at Entalogics.

No hourly billing for thinking time. Fixed quote or a transparent monthly rate.

FIXED SCOPEone-off build

Ship a Power Platform solution, end to end.

Fixed scope, fixed price, senior-only team. Audit to governed production in 6-12 weeks.

FIXED SCOPE

  • Zero juniors on client work
  • Fixed quote in week 1
  • Code, infra, runbook — yours
Plan a fixed build
DEDICATED TEAMmonthly

Hire dedicated Power Platform developers.

Senior Power Platform architects and makers embedded in your Teams, your standups. Pause, resize, or exit with 30 days' notice.

PER ENGINEER

  • Same senior bar as fixed-scope
  • Embedded in your team
  • Founder-direct escalation
Hire dedicated Power Platform developers
ENGAGEMENTcustom

Strategic Power Platform consulting partnership.

A standing partner for enterprise low-code — CoE governance, ALM, Copilot Studio, Dataverse architecture, migration planning, hiring help.

PROCUREMENT-FRIENDLY

  • Multi-quarter roadmap
  • Architecture and governance partner
  • Procurement-friendly paper
Speak to the founder
FAQ

Power Platform development —
questions we get on every call.

Custom vs low-code, sprawl prevention, model-driven vs canvas, migrations, cost — in roughly the order people ask.
For most internal approvals, forms, dashboards, and data collection apps — yes, and significantly faster. For customer-facing products, complex UI, or high-scale data processing — custom code is still the right answer. We'll tell you which applies on the first call.
CoE Starter Kit for inventory and monitoring. DLP policies per environment. Managed Environments for enterprise controls. Environment strategy that separates citizen development from production. Governance deployed before the first app, not after the three hundredth.
Model-driven for data-heavy business apps where the UI builds itself from Dataverse — role-based security, business rules, and dashboards included. Canvas for custom layouts, mobile-first experiences, and pixel-level control. Most organizations need both for different use cases.
Yes. InfoPath forms rebuilt in Power Apps with Dataverse as the backend. Access databases migrated to Dataverse with proper relational modelling. Classic SharePoint workflows replaced with Power Automate. Each replacement tested and live before the legacy tool gets switched off.
Depends on scope — number of apps, flow complexity, Dataverse modelling needs, and governance maturity. The week-one audit gives real numbers. The quote is fixed from there. Most engagements run 6-12 weeks.
Yes. The architects who write the RFC ship the solutions. No handoff mid-engagement, no account manager in between.

Founder-direct

Tell us whatyou're building.

Thirty minutes with the founder — a senior Power Platform architect, the relevant playbook, and a candid read on whether low-code is the right tool, or custom development serves your problem better.